(1) All form ties shall be removed at least flush with the concrete surface Article 9.15.6.3 Ontario Regulation 332/12 Building Code, Information published by oncodes.ca for educational purposes only. Similar articles Concrete in Contact with Sulfate Soil Walls Supporting Drained Earth Dampproofing Materials Footings Required