Light switch with multiple lights wiring diagram

Light switch with multiple lights wiring diagram Oncodes.ca publishes this information for educational purposes only. Please consult your electrician prior to any work and/or have an inspection performed. buildmyowncabin.com Note : Rule 4-022, Installation of identified conductor, to install the identified conductor at each control location of permanently installed luminaire that also includes manual control devices […]
Read more

Light switches with multiple circuits

Light switches with multiple circuits Oncodes.ca publishes this information for educational purposes only. Please consult your electrician prior to any work and/or have an inspection performed. buildmyowncabin.com
Read more

Lighting Outlets in Houses and Dwelling Units

Lighting Outlets in Houses and Dwelling Units (1)  Except as provided in Sentence (2), a lighting outlet with fixture controlled by a wall switch shall be provided in kitchens, bedrooms, living rooms, utility rooms, laundry rooms, dining rooms, bathrooms, water closet rooms, vestibules and hallways in a house or an individual dwelling unit. (2)  Where a receptacle […]
Read more

Lintel Support Over Openings

Lintel Support Over Openings (1)  Logs placed in vertical position shall be supported over window and door openings by lintels meeting the requirements of Tables A-12 to A-16. Article 9.37.3.1 Ontario Regulation 332/12 Building Code,   Information published by oncodes.ca for educational purposes only. Note : A lintel is a type of beam (a horizontal structural […]
Read more

Location of the Vapour Barrier

Location of the Vapour Barrier To prevent condensation from forming within building envelope assemblies, materials that act as vapour barriers (vapour retarders), including certain types of insulation, must be located within the assembly so that moisture moving from the inside to the outside does not condense and accumulate within the assembly. This means that vapour […]
Read more

Low Temperature Conditions Taping and Finishing

Low Temperature Conditions Taping and Finishing (1)  In cold weather, heat shall be provided to maintain a temperature of not below 10°C for 48 h prior to taping and finishing and maintained for not less than 48 h after that. Article 9.29.5.10 Ontario Regulation 332/12 Building Code, Information published by oncodes.ca for educational purposes only
Read more

Materials and Thickness Panel-type underlay

Materials and Thickness Panel-type underlay (1)  Panel-type underlay shall be not less than 6 mm thick and shall conform to,     (a)   ANSI A208.1, “Particleboard”,     (b)   CAN/CGSB-11.3-M, “Hardboard”,     (c)   ANSI/HPVA HP-1, “Hardwood and Decorative Plywood”,     (d)   CSA O121, “Douglas Fir Plywood”,     (e)   CSA O151, “Canadian Softwood Plywood”,     (f)   CSA O153, “Poplar […]
Read more