Fastening Panel-type underlay

Fastening Panel-type underlay (1)  Panel-type underlay shall be fastened to the subfloor with staples, annular grooved flooring nails or spiral nails, spaced not more than 150 mm o.c. along the edges and 200 mm o.c. both ways at other locations.  (2)  Nails for panel-type underlay shall be not less than 19 mm long for 6 mm thick […]
Read more

Finish Quality Flooring

Finish Quality Flooring (1)  Finished flooring shall have a surface that is smooth, even and free from roughness or open defects. Article 9.30.1.4 Ontario Regulation 332/12 Building Code,   Information published by oncodes.ca for educational purposes only.
Read more

Fire Block Materials

(1)  Except as permitted by Sentences (2) to (4) and (7) fire blocks shall remain in place and prevent the passage of flames for not less than 15 min when subjected to the standard fire exposure in CAN/ULC-S101, “Fire Endurance Tests of Building Construction and Materials”. (2)  Gypsum board not less than 12.7 mm thick and sheet […]
Read more

Floor Coverings

Floor Coverings, Floors are subject to wear and tear. Higher-quality finish flooring can often be cost effective becauseit will likely last longer than less expensive flooring. The sub-flooring must be adequate to support the finished flooring, especially ceramic tile. Planning the type of finished flooring to be used can minimize elevation differences (tripping hazards) between […]
Read more

Floor Performance

Floor Performance The floor joist span tables incorporate vibration criteria. The tables recognize that some floor constructions are more “bouncy” or “springy” than others. Therefore, by adding blocking or increasing subfloor thickness, floors will be less springy or bouncy and floor joist spans may be increased. Alternatively, engineered wood products such as laminated veneer lumber […]
Read more

Framing for Plumbing systems

Framing for Plumbing systems The installation of the plumbing system usually begins after the framing is complete. The initial work is called “roughing-in” and includes installing plumbing vents and drains and all hot and cold water piping that will be enclosed in the walls and ceilings and under the basement floor. Since the bathtub must […]
Read more

General Receptables (see Appendices B and G)

General Receptables (see Appendices B and G) Receptacles for all residential occupancies (including dwelling units and single dwellings) shall meet thefollowing requirements: a) for the purposes of this Rule, i) “finished wall” shall mean any wall finished to within 450 mm of the floor with drywall, wood panelling, or like material; andii) a controlled outlet […]
Read more